    Info in item information screen

    Plc consider to add - information is item tradable, no-refundable /not tradable etc


    Still THIS this so far was and is advertized as RCE, so all items would be tradable...
    Resnis

    Now comic part how thing might go ....

    Ps estimates in normal dev
    1. PM_0 - Management decision - 5min , adding to schedule/release plan 5 min
    2. ANA1 - Analysis 10 min (data already got to be in DB ,.. need to add in view only as new line)
    3. RQM1 - Specification ~ 15 min
    4. DEV1 - Coding (view - to display) = 30 min
    5. TST1 - 10 min testing (thing what MA never does in-house ... )
    6. REServe - Wasted time ~ + 1h (things never are 100% straight (//reserve))
    7. BLD1 - Add to patch ... 2 min
    8. DEP - no seperate VU, = 0 effort additional needed , Deployment in staging environent 1, and PROD 2nd
    9. MNG - Management overhead 15 min
    so total ~ 2 h - 2.5h
    time till deployment ~ 3 workdays needed (duration)

    MA approach -
    1. PM_0 - Postpone Analysis 3 years - Effort in analysis 0 in junk communication ~ 50h
    2. ANA1 Forget to do analysis when time comes actual effort = 0 but written off ~ 50 h ?
    3. RQM1 - - just not done - WHO needs 2 specify ... in Ninja coding
    4. DEV1 - Add new code (crating new 5+functions, 7+ DB calls etc .. Game size +150MB as lots of junk added as well )what calculates values what are written in code as text (plan text .. why any1 needs optimization), (not re-use existing,... ), not using any technical coding standards, Coding done by 1 year drop-out student , what was not even capable of study of economics...
    5. TST1 - 0 testing (thing what MA never does in-house ... )
    6. REServe - Who need reserves in ninja coding ?
    7. BLD1 - Add to patch ... adding in 3 patches , as no documented then messed up builds 4 times each, + 2 times Bug fixes
    8. DEP - no seperate VU, = 0 effort additional needed , 5 h as need 2 separate bugfixes at least,...

    9. MNG - Management overhead 50h

    10. - bug analysis - 5 h
    11. roll back - 20h 2 times as all things failed
    12. Bug fix dev - 5h need 2 times at least
    13. Mess all things up ... Analysis_3 ... 15h

    14. Aditional Management overhead for Crisis management- 100 h +

    15. Never gets implemented
    16. In surprize case ... if get implemented ~ 3 year duration ...

    Total ~ 200h needed 2 add 1 line in a form ... to display data what are in DB already ...

  2. #2
    Dominant Orion's Avatar
    Joined
    Apr 2005
    Gender | Ingame
    Male | Female
    Avatar
    Eleria 'Orion' Starwind
    Society
    Shaolin
    Posts
    387
    Images
    54
    sadly you are very right here.

    the impression fortifies that MA has pulled the plug on further development, innovation and bugfixing of their (one and only working!) product.

    but this is an understandable management decision:
    else MA would risk to gain new / to lose less / to please their customers, which would mean more work for MA. and workload must be minimized!


    MA:
    scrap the catastrophic side show projects!
    concentrate on the game!

    because: i only pay for the game!
    30% OFF Markup: Genesis Amethera Headquarters, Tower B, Block B, Shop #4
    http://www.planetcalypsoforum.com/gallery/files/6/2/2/shaolin_leader_signatur_orion.jpg

    Proud Citizen of Calypso since February 9th, 2002

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Follow Planet Calypso on Twitter  Follow Planet Calypso on Facebook